ALE has successfully loaded, transported and rotated a 100t ship hull in South Africa

The project, which took place in Table Bay Harbor, South Africa, was performed in several stages over three days.The first consisted in loading the hull onto 24 axle lines of self-propelled trailer before transporting it from the fabrication warehouse to the rotation area within the harbour. Then the hull, which was built upside down to …