Fagioli removes six sections of the Berkan B wreck

After months of challenging operations executed by Fagioli to remove the six sections of the Berkan B wreck, eventually the wreck parts are heading by barge to their final destination in Piombino. The demanding removal operations were performed by means of crawler cranes and barges with dedicated studies and interventions concerning environmental matters and the …

Fagioli installs Syncrolift platform in Genova

Fagioli has recently completed the final installation of a Syncrolift platform in Genova. Platform dimensions were the followings: length 84m, width 22m, height 2m. The 900t structure was transported from manufacturing area in Brindisi onto a dedicated barge by means of 4 x 10 axle lines SPMTs and sea transported up to Genova port. According …