Every MOVE IT story about LTM 1650-8.1: lifts, moves, contracts, projects and people.

The Bielefeld branch of the Federal Agency for Technical Relief (THW) has hoisted a 46 tonne temporary prefabricated bridge over the River Erft replacing the bridge that was destroyed and…

Grúas Ibarrondo replaced three rotor blades on an SG 4.X wind turbine, each measuring 64.5 metres in length and weighing in at 24 tonnes, with new rotor blades with a…

In response to the ongoing expansion in the number of wind turbines in Poland, the crane and heavy haulage contractor Dźwig-Mar s.c. has upgraded its fleet with the first Liebherr…
Features, interviews and reports on the biggest lifts and moves. Free for registered readers.