The world leading magazine of heavy lifting and transport equipment for construction, energy, maritime and industry

C.H. Robinson completes 16 month project with over 70 shipments

Rate this post

C.H. Robinson Project Logistics recently undertook a huge project to help transport 720 pieces of equipment to Turkey weighing a total of 2,463mtn. The job spanned 16 months and included 9 origin countries, 3 ocean charters and took 70+ shipments to complete. `

The components were sourced from locations across the globe and transported to Turkey through various means, including vessels, barges, and SPMTs. The heaviest piece weighed 109,960kg and the largest measured 57.9 x 3.6 x 4.1m.

The project was moving smoothly until a surge in Covid-19 cases caused industry delays. This included one of the charter vessels being held up outside of Korea for 3-4 days until the entire crew could be tested for the virus.

Additionally, the team had to work quickly in a congested logistics market to ensure a vessel out of Italy sailed before the permits expired. Due to their good coordination, C.H. Robinson were able to sort out any issues and the charter was discharged on time.

Share This Post: