ALE installs new turbine and generator at a power plant in Egypt

ALE has recently completed the swift installation of a turbine and generator at the Supercritical Power Plant in Assiut, Egypt. To install the steam turbine, weighing 240t and measuring 8m long, ALE used a gantry and 200t capacity strand jacks to lift the turbine 16m from the ground. As the entrance to the building was …