<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	xmlns:media="http://search.yahoo.com/mrss/" >

<channel>
	<title>Allelys &#8211; Move It Magazine</title>
	<atom:link href="https://moveitmagazine.com/tag/allelys/feed/" rel="self" type="application/rss+xml" />
	<link>https://moveitmagazine.com</link>
	<description>The world&#039;s leading magazine for heavy lifting and transport equipment</description>
	<lastBuildDate>Sun, 18 Oct 2026 10:44:11 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://moveitmagazine.com/wp-content/uploads/2023/01/MOVE-IT-LOGO-LINKs-100x100.png</url>
	<title>Allelys &#8211; Move It Magazine</title>
	<link>https://moveitmagazine.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Allelys Upgrades AK912 with Stage V Power</title>
		<link>https://moveitmagazine.com/2026/09/04/allelys-upgrades-ak912-with-stage-v-power/</link>
		
		<dc:creator><![CDATA[Lena Johnson]]></dc:creator>
		<pubDate>Fri, 04 Sep 2026 10:06:25 +0000</pubDate>
				<category><![CDATA[Cranes]]></category>
		<category><![CDATA[Europe]]></category>
		<category><![CDATA[Heavy lifting]]></category>
		<category><![CDATA[Lifting]]></category>
		<category><![CDATA[Allelys]]></category>
		<guid isPermaLink="false">https://moveitmagazine.com/?p=42219</guid>

					<description><![CDATA[Allelys has completed a major upgrade to its AK912 mobile crane, installing a new Deutz TCD 7.8 Stage V engine to improve fuel efficiency, reduce emissions and extend the crane’s operational life. The new power unit replaces the AK912’s previous engine and brings the crane in line with current Stage V emissions requirements. Allelys said [&#8230;]]]></description>
		
		
		
			</item>
		<item>
		<title>Allelys Adds 1,070-Tonne Enerpac Gantry to Fleet</title>
		<link>https://moveitmagazine.com/2026/08/26/allelys-adds-1070-tonne-enerpac-gantry-to-fleet/</link>
		
		<dc:creator><![CDATA[Lena Johnson]]></dc:creator>
		<pubDate>Wed, 26 Aug 2026 12:36:43 +0000</pubDate>
				<category><![CDATA[Lifting]]></category>
		<category><![CDATA[Europe]]></category>
		<category><![CDATA[Heavy lift]]></category>
		<category><![CDATA[Heavy lifting]]></category>
		<category><![CDATA[Allelys]]></category>
		<category><![CDATA[Enerpac]]></category>
		<guid isPermaLink="false">https://moveitmagazine.com/?p=42130</guid>

					<description><![CDATA[Allelys is increasing its specialist heavy lifting capacity with the addition of an Enerpac SBL1100 hydraulic gantry system, taking its hydraulic gantry fleet to eight systems. With a maximum lifting capacity of 1,070 tonnes and a lifting height of up to 12 metres, the SBL1100 is now the highest-capacity hydraulic gantry in the Allelys fleet. [&#8230;]]]></description>
		
		
		
			</item>
		<item>
		<title>Allelys Announces Leadership Restructure</title>
		<link>https://moveitmagazine.com/2025/11/06/allelys-announces-leadership-restructure/</link>
		
		<dc:creator><![CDATA[Lena Johnson]]></dc:creator>
		<pubDate>Thu, 06 Nov 2025 10:20:27 +0000</pubDate>
				<category><![CDATA[United Kingdom]]></category>
		<category><![CDATA[Allelys]]></category>
		<guid isPermaLink="false">https://moveitmagazine.com/?p=39307</guid>

					<description><![CDATA[Allelys has announced a major leadership transition as the company continues its strong growth trajectory and responds to rising demand across the UK heavy lift and specialist transport market. As part of its long-term strategy, Richard Beardmore has been promoted to managing director, taking responsibility for day-to-day operations and the delivery of the company’s objectives. [&#8230;]]]></description>
		
		
		
			</item>
		<item>
		<title>Allelys Completes Precision Lift of 146te Yankee Dryer at Shotton Mill</title>
		<link>https://moveitmagazine.com/2025/06/16/allelys-completes-precision-lift-of-146te-yankee-dryer-at-shotton-mill/</link>
		
		<dc:creator><![CDATA[Lena Johnson]]></dc:creator>
		<pubDate>Mon, 16 Jun 2025 14:22:00 +0000</pubDate>
				<category><![CDATA[Lifting]]></category>
		<category><![CDATA[Heavy lift]]></category>
		<category><![CDATA[Heavy lifting]]></category>
		<category><![CDATA[Allelys]]></category>
		<guid isPermaLink="false">https://moveitmagazine.com/?p=38052</guid>

					<description><![CDATA[Allelys has successfully executed a complex transport and lifting operation for the installation of a 146-tonne Yankee drying cylinder at Shotton Mill in Flintshire. The operation, fully engineered and project managed by Allelys, involved receiving the cargo at Ellesmere Port, transporting it to the mill, and installing it through the roof of an existing building. [&#8230;]]]></description>
		
		
		
			</item>
		<item>
		<title>AK912 Returns for Heavy Lifts at UK Port</title>
		<link>https://moveitmagazine.com/2025/04/08/ak912-returns-for-heavy-lifts-at-uk-port/</link>
		
		<dc:creator><![CDATA[Roberta T]]></dc:creator>
		<pubDate>Tue, 08 Apr 2025 05:58:37 +0000</pubDate>
				<category><![CDATA[Heavy lifting]]></category>
		<category><![CDATA[Cranes]]></category>
		<category><![CDATA[Heavy lift]]></category>
		<category><![CDATA[Lifting]]></category>
		<category><![CDATA[Mobile Cranes]]></category>
		<category><![CDATA[Allelys]]></category>
		<guid isPermaLink="false">https://moveitmagazine.com/?p=37235</guid>

					<description><![CDATA[Allelys has marked the return of its iconic AK912 mobile crane to the UK market with a high-profile project at the Port of Sutton Bridge, lifting critical infrastructure components in its first assignment since undergoing a complete refurbishment. The project involved the precision lifting of two 365.9-tonne generators and two 164-tonne transformers from a vessel [&#8230;]]]></description>
		
		
		
			</item>
		<item>
		<title>Allelys Unveils Refurbished Gottwald AK912 Pedestal Crane</title>
		<link>https://moveitmagazine.com/2025/03/17/allelys-unveils-refurbished-gottwald-ak912-pedestal-crane/</link>
		
		<dc:creator><![CDATA[Lena Johnson]]></dc:creator>
		<pubDate>Mon, 17 Mar 2025 11:34:21 +0000</pubDate>
				<category><![CDATA[Heavy lifting]]></category>
		<category><![CDATA[Cranes]]></category>
		<category><![CDATA[Heavy lift]]></category>
		<category><![CDATA[Lifting]]></category>
		<category><![CDATA[Allelys]]></category>
		<category><![CDATA[Gottwald AK912]]></category>
		<category><![CDATA[UK]]></category>
		<guid isPermaLink="false">https://moveitmagazine.com/?p=36706</guid>

					<description><![CDATA[Allelys has announced the return of its Gottwald AK912 pedestal crane to the UK market, bolstering the company’s heavy lift capabilities. With a lifting capacity of 1,200 tonnes and a main boom length of 113 metres, the AK912 is one of the largest capacity cranes available. Richard Beardmore, Chief Commercial Officer at Allelys, commented, “Our [&#8230;]]]></description>
		
		
		
			</item>
		<item>
		<title>Allelys Expands with New Office in Felixstowe</title>
		<link>https://moveitmagazine.com/2025/03/12/allelys-expands-with-new-office-in-felixstowe/</link>
		
		<dc:creator><![CDATA[Lena Johnson]]></dc:creator>
		<pubDate>Wed, 12 Mar 2025 10:41:07 +0000</pubDate>
				<category><![CDATA[Heavy transport]]></category>
		<category><![CDATA[Logistics]]></category>
		<category><![CDATA[Allelys]]></category>
		<category><![CDATA[Felixstowe]]></category>
		<guid isPermaLink="false">https://moveitmagazine.com/?p=36507</guid>

					<description><![CDATA[Heavy transport and logistics specialist Allelys has announced the opening of its third UK office in Felixstowe, Suffolk. The new location will support its existing offices in Studley, Warwickshire, and Stoke-on-Trent, Staffordshire, strengthening the company’s operational capabilities. Richard Beardmore, Chief Commercial Officer at Allelys, highlighted the strategic move: “As a business, we’re constantly looking for [&#8230;]]]></description>
		
		
		
			</item>
		<item>
		<title>Allelys Powers Lostock Delivery</title>
		<link>https://moveitmagazine.com/2024/12/10/allelys-powers-lostock-delivery/</link>
		
		<dc:creator><![CDATA[Roberta T]]></dc:creator>
		<pubDate>Tue, 10 Dec 2024 11:11:42 +0000</pubDate>
				<category><![CDATA[Heavy transport]]></category>
		<category><![CDATA[Heavy lift]]></category>
		<category><![CDATA[Heavy lifting]]></category>
		<category><![CDATA[Lifting]]></category>
		<category><![CDATA[Transport]]></category>
		<category><![CDATA[Allelys]]></category>
		<guid isPermaLink="false">https://moveitmagazine.com/?p=35227</guid>

					<description><![CDATA[Once more Allelys showcased its competence of delivering complex turnkey projects as they completed the transport and installation process of key equipment at the Lostock Sustainable Energy Plant located in Northwich. In this project, a steam turbine weighing 154-tonne and a generator weighing 132-tonne were taken from Ellesmere Port to the Power station site emphasizing [&#8230;]]]></description>
		
		
		
			</item>
		<item>
		<title>Allelys Announces Major Equipment Purchase </title>
		<link>https://moveitmagazine.com/2024/08/26/allelys-announces-major-equipment-purchase/</link>
		
		<dc:creator><![CDATA[Roberta T]]></dc:creator>
		<pubDate>Mon, 26 Aug 2024 08:27:16 +0000</pubDate>
				<category><![CDATA[Heavy transport]]></category>
		<category><![CDATA[Equipment]]></category>
		<category><![CDATA[Trailers]]></category>
		<category><![CDATA[Allelys]]></category>
		<category><![CDATA[Trojan trucks]]></category>
		<category><![CDATA[UK]]></category>
		<guid isPermaLink="false">https://moveitmagazine.com/?p=34125</guid>

					<description><![CDATA[Allelys has announced a significant investment in new equipment to expand its fleet, reaffirming the company’s dedication to meeting rising market demand. The new purchase includes an array of girder frame trailers, modular axles, and heavy ballast trucks, including the UK-built Trojan trucks. The first batch of equipment has already been integrated into the fleet, [&#8230;]]]></description>
		
		
		
			</item>
		<item>
		<title>Allelys Installs Turbine and Generator Through Turbine Hall Roof</title>
		<link>https://moveitmagazine.com/2024/02/02/allelys-installs-turbine-and-generator-through-turbine-hall-roof/</link>
		
		<dc:creator><![CDATA[Roberta T]]></dc:creator>
		<pubDate>Fri, 02 Feb 2024 08:59:01 +0000</pubDate>
				<category><![CDATA[Heavy lifting]]></category>
		<category><![CDATA[Heavy lift]]></category>
		<category><![CDATA[Heavy transport]]></category>
		<category><![CDATA[Lifting]]></category>
		<category><![CDATA[Allelys]]></category>
		<guid isPermaLink="false">https://moveitmagazine.com/?p=32606</guid>

					<description><![CDATA[Allelys has engineered an innovative solution to minimize site disruption during the installation of a turbine and generator components through the roof of a turbine hall, situated at a height of 22.3m. The 160te turbine, measuring 7.8m (l) x 5.35m (w) x 4.6m (h), arrived at Goole docks, where Allelys efficiently discharged it using the [&#8230;]]]></description>
		
		
		
			</item>
	</channel>
</rss>
